This tank was under consideration to be built via concrete or welded but the design team performed a Life cycle cost analysis and overall bid the job as a welded steel tank. It was designed to meet the new demands of an ever growing city as well as supplement future demand of additional housing tracks. This asset will be a critical part of their system for decades/ centuries to come.
The tank was designed in accordance with AWWA D-100 section 14 in order to be as cost effective as possible; but due to high seismic load’s and the tank being located just feet away from the San Andres Fault line there were many precautions taken in the design/supply of the reservoir. The tank as a whole weighed more than 1.2 million pounds and was constructed during the Santa Ana winds. The effects of the high winds were amplified by the fact that it’s located on a mountain range which regularly sees winds in excess of 60 mph on any given day. Although there were many days which the crew had to work split shifts or submit a weather delay, we were still able to complete the job on time with a satisfied customer and a safe crew. This was due to the construction sequencing of a welded steel tank and the ability to start / stop as needed in order for the crew to safely follow all applicable safety regulations.
Reservoir 4606-1 (Mission Hills Pressure Zone)
STI/SPFA 2017 Tank of the Year (2nd Place)


New 6.8 MG Welded Steel Tank for Water and Wastewater Infrastructure
Related Industries
Project summary
This tank was under consideration to be built via concrete or welded but the design team performed a Life cycle cost analysis and overall bid the job as a welded steel tank. It was designed to meet the new demands of an ever growing city as well as supplement future demand of additional housing tracks.
Location
Company
Completed
Height
Diameter
Capacity
Tonnage
Thickness
Construction Standard